ENEM

ITA

IME

FUVEST

UNICAMP

UNESP

UNIFESP

UFPR

UFRGS

UNB

VestibularEdição do vestibular
Disciplina

(IME - 2009/2010 - 1 FASE)Leia a passagem seguinte

(IME - 2009/2010 - 1ª FASE)

Leia a passagem seguinte e responda à pergunta que a seguem. 

Built in the mid-1960s, the Riverside Drive Parking Deck in Elgin, Illinois, is quite large. Approximately 1,000-ft (300-m) long by 60-ft (18-m) wide – and nearly all of it over the Fox River – the deck is built on hundreds of ‘piles’, large concrete cylinders pushed down into the muddy river bottom. Pre-cast elements in the piles used high-tensile steel wire for reinforcement, and that steel is now rusting. A trail-sized piece of the deck has even fallen into the river causing concern to local authorities.   

About the Riverside Drive Parking Deck, what can NOT be concluded? 

A
The concrete cylinders used in its construction were made stronger by adding metal to their bodies.
B
The deck should be analyzed for further renewal.
C
Steel has been used in order to prevent the possibility of rusting.
D
Its structure contains steel.
E
It needs repair.